Week #
|
Friday Date
|
Deliverables
|
2
|
10/3
|
1) Meeting held with client Jamie Rotter to determine basic structure of
culinary competition (*documented)
2) Brief filming session of culinary class lab tentatively scheduled
3) Investigation made into possible filming locations
4) Invitations sent to marketing & strategic growth committee clients
to meet with class for their input into project
5) Storyboard ideas outlined
6) Various film angles brainstormed
7) Script ideas outlined
8) Assigned roles outlined
|
3
|
10/10
|
1) Script drafted, Episode 1
2) Storyboard drafted, Episode 1 (*documented)
3) Additional client meetings held (*documented)
4) Investigation into budget issues, possible sponsorships
5) Culinary class filming date finalized, equipment reserved
6) Exploration of music options (*documented)
7) Logo design drafted and animation ideas outlined (*documented)
8) List made of potential judge and emcee candidates with contact info
|
4
|
10/17
|
1) Logo design finalized, intro animation outlined (*documented)
2) Location and film date(s) finalized
3) Film site visited to determine logistics, set & equipment needs (*documented)
4) Equipment located and reserved
5) Contest rules, structure & ingredients finalized with client (*documented)
6) Script drafted, Episode 2
7) Storyboard drafted, Episode 2 (*documented)
8) Invitations sent to judges and emcee(s)
9) Culinary class lab filmed (*documented)
10) Set design outlined (*documented)
|
5
|
10/24
|
1) Intro animation designed, ideas for segue animations outlined (*documented)
2) Culinary class lab segment edited
(*documented)
3) Twitter account set up (*documented)
4) Set design finalized (*documented)
5) Script and storyboards finalized
6) Emcee(s), judges and volunteer crew members finalized
7) Competition filmed (?) (*documented)
8) Prize/gift ideas brainstormed and costed out (*documented)
9) Budget reviewed, additional sponsors contacted
10) Music options narrowed down
|
6
|
10/31
|
1) Narration recorded (*documented)
2) Competition filmed (?) (*documented)
3) Animation segues designed, credits animation begun (*documented)
4) Tweet #1 sent
5) Still photos taken/edited, news release/photo #1 distributed (*documented)
|
Week #
|
Friday Date
|
Deliverables
|
7
|
11/7
|
1) Music & sources of kitchen/other sound effects selected (*documented)
2) Episode 1 edited (*documented)
3)
FLCC website link explored
4)
Tweet #2 sent
5)
Credits animation fully drafted
|
8
|
11/14
|
1) Episode 2 edited (*documented)
2) Episode 1 finalized
3) Tweet #3 sent
4) Still photos taken/edited, news release/photo #2 distributed (*documented)
5) Credits animation finalized (*documented)
6) Class presentation prepared (*documented)
|
9
|
11/21
|
1) Edits and adjustments made based on class feedback
2) Finalize Episode 2
3) Tweet #4 sent
4) Designs of contest elements created for posters, signage, invitations
& DVD labels (*documented)
5) Script and storyboard drafted for FLTV promotional ad (*documented)
6) Panel presentation prepared (*documented)
|
* documented = suggested possibilities for documenting project
progress
No comments:
Post a Comment